Sunday, October 25, 2009

Gas Tank mounted and Handle Bars Installed

Mounted the 3 deg neck cups (still have a lot of custom work to make the stem neck nuts and bearing to seat in properly) but this gave the measurements for the floating gas tank mounts.




 
also mounted the biltwell handle bars with 4in risers with 1in pull back


 
 

 



Wednesday, September 30, 2009

Rear tire mounted/tank pre-veiws

got the rear tire mounted to day








also layed out the seat pan, fender and gas tank for a pre-veiw






 



 







Saturday, September 19, 2009

front tire and rotor installed














 Got the front tire on today and lowered down the rear to see how much rake there would be,
new rear rim should be here next week and will have the rear rubber on asap
check back for updates!















Springer!

the springer front end arived today,
its a wyatt gatling springer kit, 2 over stock

































Wednesday, September 16, 2009

Oil Tank Kit/welding















ordered a pipe bomb tank kit from Bung King and brought it over to
Holeshot cycles to get it tig welded
now i needed to weld tabs and brackets and the oil tank will be all set.



























Tuesday, September 15, 2009

new parts!

some new parts came in today,
Ordered a streched sportster peanut gas tank from AMC,
2.5 gallons
17inchs long












also since i made this ironhead a bobber i spent the extra cash and got some nice good shocks from chopper shox instead of spring for my seat pan.



























also tires came in last week 


90-90-21 up front Metzeler ME 880 Whitewall
140-90-16 in the rear Metzeler ME 880 Whitewall










also received my pipes by Paughco from steel thunder cc.com








1 3/4 inch O.D. Paughco upsweep gooseneck drag exhaust set









Mock up build

After reassembling the engine i reinstalled it back in the motor to start doing mock ups and welding.