also layed out the seat pan, fender and gas tank for a pre-veiw
Wednesday, September 30, 2009
Saturday, September 19, 2009
front tire and rotor installed
Wednesday, September 16, 2009
Oil Tank Kit/welding
ordered a pipe bomb tank kit from Bung King and brought it over to
Holeshot cycles to get it tig welded
now i needed to weld tabs and brackets and the oil tank will be all set.
Tuesday, September 15, 2009
new parts!
some new parts came in today,
Ordered a streched sportster peanut gas tank from AMC,
2.5 gallons
17inchs long
also since i made this ironhead a bobber i spent the extra cash and got some nice good shocks from chopper shox instead of spring for my seat pan.
also tires came in last week
90-90-21 up front Metzeler ME 880 Whitewall
140-90-16 in the rear Metzeler ME 880 Whitewall
also received my pipes by Paughco from steel thunder cc.com
1 3/4 inch O.D. Paughco upsweep gooseneck drag exhaust set
Ordered a streched sportster peanut gas tank from AMC,
2.5 gallons
17inchs long
also since i made this ironhead a bobber i spent the extra cash and got some nice good shocks from chopper shox instead of spring for my seat pan.
also tires came in last week
90-90-21 up front Metzeler ME 880 Whitewall
140-90-16 in the rear Metzeler ME 880 Whitewall
also received my pipes by Paughco from steel thunder cc.com
1 3/4 inch O.D. Paughco upsweep gooseneck drag exhaust set
Mock up build
After reassembling the engine i reinstalled it back in the motor to start doing mock ups and welding.
Frame Work
so now its time for some frame work, after tons of planing and google search after google search i finally decided what i wanted to do with my frame.
to weld on the v-twin hard tail i needed to strip the frame down and remove the swingarm and shocks
AFTER:
Thanks to Red Devil Cycles for the welding
to weld on the v-twin hard tail i needed to strip the frame down and remove the swingarm and shocks
AFTER:
Thanks to Red Devil Cycles for the welding
Monday, September 14, 2009
Engine Checkout
pulled out the motor for visual inpection, micing and mesuring will come later before it will be setup for its first run.
after removing the heads jugs and rocker boxs
the valve heads where pretty rusty and sezied
the cylinder walls had minimal scoring and just a little carbon deposits, im thinking pre-detonation?
The pistions also looked good with minimal scoring and small deposists on the head, rings where in great shape with no craking or heavy wearing.
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEggJ-hEH51tDEZNXx6wqZXct2UrJY4yxKuFhvxzlaua1oaA9DV-LVBkUuRS-1BcJGR9Cmgt7Cym-4LYn16ci7JvEVYxZ3U6_R_1_lgKcUjAYv9QnyOocHkxlXvS3808Uv_RkW2du1udwdXb/s200/PB270022(2).jpg)
primary chain had some slack, not sure what the proper tension is but thats what the Harley manual is for.
Sunday, September 13, 2009
Inspection
As i started looking over the bike i started to notice quite a bit of rust, i also noticed that my coil was cracked
after more looking over i noticed that it had beed sitting out side with no filter on the carb with the butterfly valve open, this made me curious and worried at the same time and figured id better remove the carb and have a look at the heads
after removing the carb this is what i found.....
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEh5YY9phuRuptmk6H4P85BXWeFCHvi83V47FO4FM1h_1IRtqu3zwGbmc9v3mpvHS9W3Gh-eGqywZ77sCS1wIbsw3fT2zk6tTGrcbON1Z70fFbQopAB-g-dMI-UIrS86FyvKuyZBe4qIS1rS/s200/P9080165.JPG)
This ment the motor was coming out of the bike for a full strip down and inspection
after more looking over i noticed that it had beed sitting out side with no filter on the carb with the butterfly valve open, this made me curious and worried at the same time and figured id better remove the carb and have a look at the heads
after removing the carb this is what i found.....
This ment the motor was coming out of the bike for a full strip down and inspection
Subscribe to:
Posts (Atom)